工程量时劳需用机械每每工天班序间动台工作天号分部分项工程名称定名班班人4/1/2014单数量组2468101214161820222426量额称数数数数位d1机械开挖m3530.180.0159挖掘机31432人工开挖m3480.3151823垫层支模10m25.60.21121344基垫层浇筑m330.870.165251砖基础砌筑m3108.460.576917105础123工地梁钢筋t0.9616.2166程7地梁支模10m25.90.2121348基础梁砼m310.320.553519土方回填m3596.780.0513616610砖墙砌筑m394.310.8883蛙式夯51712111梁板模板10m220.31.1724138121212层钢筋绑扎t3.2687.22313混泥土浇筑m320.720.931935414砖墙砌筑m394.210.8883171215梁板模板210m26.021.1724138层钢筋绑扎t10.497.223121216主体工程2层17主体混泥土浇筑m320.720.93193540.8883171218工砖墙砌筑m394.211.1724138程7.22312120.931935419梁板模板310m26.020.88831712层钢筋绑扎m310.491.1724138207.22312120.931935421混泥土浇筑m320.720.85141539.13.512222墙体砌筑m394.212.2551510.412915223梁板模板410m26.020.908641416层钢筋绑扎m310.490.5611117162410.489.517132.792415525混泥土浇筑m320.725.88015161.5779151626女儿墙m316.8527屋面钢筋绑扎t0.36528工压顶/构造柱m32.22程29防水10m222.430顶棚10m269.431内墙面抹灰10m2179.132装饰外墙抹灰10m289.933工踢脚10m8.6程34地砖地面10m213.835抹灰地面10m250.2动量总劳:173821总工期:14617均18高峰期天人数:9.5劳平均天人数:衡系动15数力符动12合态要曲9K=Rmax/R平均=17/9.5=1.79<2求线63XX中学教师宿舍施工进度横道图施工进度计划5/1/20146/1/20147/1/201446810121416182022242624681012141618202224262468101214161820·148/1/20149/1/201422242624681012141618202224262468101214161820222426
发表评论取消回复